A comparison of different options shows how separatus geothermal probes reduce drilling depth, total drilling length, and project risks in challenging geological conditions. The optimized hydraulics also improve…
Efficiently planning short geothermal probes: In a project comparison for a school building, separatus achieves the same design reliability with one less borehole and a smaller borehole diameter…