Kategorie: Blog

  • 07.07.26
    A comparison of different options shows how separatus geothermal probes reduce drilling depth, total drilling length, and project risks in challenging geological conditions. The optimized hydraulics also improve…
  • 07.07.26
    Efficiently planning short geothermal probes: In a project comparison for a school building, separatus achieves the same design reliability with one less borehole and a smaller borehole diameter…
English

× Close